Why October decides whether your mezzanine is ready by January
A mezzanine installed over the Christmas and New Year shutdown depends on decisions made in October. Installation is the shortest stage of the project. Design, engineering, approval, fabrication and finishing all take longer, and each one has to be complete before the site closes in late December. Working backwards from the 2026 to 2027 shutdown shows which decisions need to be locked in this month, and why a prefabricated modular system suits a short installation window.