Cardinal Logistics
Client
Cardinal Logistics
Location
Drury NZ
Problem
Spanning 10,000m², the client required Integrated Automation support structures and access systems for New Zealand's largest automated warehouse. The challenge was to design structures for installation in a highly congested work environment, with multiple trades operating simultaneously. Unistor was tasked with providing PS1 and PS2 engineer certifications while considering the seismic load requirements mandated for projects in New Zealand.
Solution
Unistor, chosen for its extensive experience in collaborating with integrators, successfully delivered this significant project. Our unique system, providing a superior finish and a 20% reduction in installation time compared to conventional steel structures, made us the ideal partner.
The team adeptly designed and implemented Integrated Automation support structures and access systems tailored to the client's needs, overcoming challenges in a congested work environment, complex engineering certifications and seismic load requirements.
Double The Floor Space In Your Warehouse