Unistor was engaged by an industrial builder to manufacture and install 65 Mezzanine floors with thermal insulated R-flor and AS1428 compliant handrail, balustrade and stairs.

The mezzanine components were manufactured to order in house by Unistor in just under 3 weeks. (that’s over 21 mezzanines and staircases with vertical bar balustrade and handrail per week) Installation was then carried at the pace required to work within the builder’s programme.